[1]
T. Mayureesawan* and P. S. Na Ayudthya, “Design and Testing of A Sampling Plan for Two Continuous Production Lines”, Curr. Appl. Sci. Technol., vol. 6, no. 2a, pp. 415–423, Mar. 2018.