Minimizing The Cost of an Integrated Model by EWMA Control Chart

Authors

  • Pramote Charongrattanasakul Department of Mathematic, Faculty of Science, King Mongkut’s University of Technology Thonburi, Bangkok 10140, Thailand.
  • Adisak Pongpullponsak Department of Mathematic, Faculty of Science, King Mongkut’s University of Technology Thonburi, Bangkok 10140, Thailand.

Keywords:

Integrated model, EWMA control chart, SPC, PM

Abstract

Two key tools for process management are statistical process control (SPC) and maintenance management (MM). An economic model can be created when they are coordinated. This paper studied the exponentially weighted moving average (EWMA) control chart of SPC and planned maintenance, as well comparing the optimal values of an X-bar control chart and an EWMA control chart. A mathematical model was developed to analyze the cost computed from the EWMA control chart. This was used to find the optimal values of variable parameters (n*,h*,L*,k*) that minimized the hourly cost. 

Downloads

Published

2009-12-31

How to Cite

Pramote Charongrattanasakul, and Adisak Pongpullponsak. 2009. “Minimizing The Cost of an Integrated Model by EWMA Control Chart”. Agriculture and Natural Resources 43 (5). Bangkok, Thailand:385-91. https://li01.tci-thaijo.org/index.php/anres/article/view/244847.

Issue

Section

Research Article